← Back to map

Berkshire Power

Hampden County, Massachusetts · EIA plant ID 55041 · Operator: Berkshire Power Co LLC
Natural gasNatural Gas Fired Combined CycleISONEBA: ISNE
Nameplate289MWSummer 229 MW
Generators1in service
Net generation810GWh12 mo to Dec 2025
Capacity factor24%gas/coal/oil units, summer MW
Heat rate7,393Btu/kWhfossil units, electric fuel, HHV
First online1999Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202524.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,5006,0006,5007,0007,500200520102015202020257,393 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001622.8——
20021,379.1——
20031,204.159.2%7,026
20041,232.360.4%7,305
20051,172.457.7%7,403
2006637.731.4%7,474
20071,041.951.2%7,233
20081,120.354.9%7,232
2009709.334.9%7,291
20101,00350.0%7,293
20111,060.252.8%7,347
2012761.937.8%7,552
20131,114.955.5%7,472
20141,189.159.2%6,034
20151,10955.2%7,512
2016822.140.8%7,556
2017387.319.3%7,618
2018637.231.7%7,537
2019367.518.3%7,472
2020617.630.7%7,386
2021779.638.8%7,338
2022549.227.3%7,338
202370.13.5%7,566
2024573.328.5%7,308
2025809.540.3%7,393

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN2Natural Gas Fired Combined CycleCS289229.2Sep 1999Operating—coming soon
GEN1—CT180153Sep 1999not_current—coming soon

Owner / operator

Operator: Berkshire Power Co LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Berkshire Power Co LLC100.0%289 MW

Nearby plants

Within 80 km.
ENGIE 2019 ProjectCo-MA1, LLC5 MW0.8 km
Route 57 Solar2 MW1.8 km
CES Agawam Tuckahoe Solar Hybrid6 MW3.8 km
Canis Major Solar Farm2 MW4.3 km
Agawam Solar2 MW4.7 km
Citizens Agawam Landfill Solar2 MW6.6 km