← Back to map

Expressway Solar A

San Bernardino County, California · EIA plant ID 58761 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202627.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20142.924.6%—
20154.827.2%—
2016528.4%—
20174.827.5%—
20184.928.2%—
20194.827.7%—
20204.727.0%—
20214.928.1%—
20224.928.0%—
20233.821.8%—
20244.525.8%—
20254.827.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EXSASolar PhotovoltaicPV22May 2014Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Expressway Solar B2 MW0.2 km
Expressway Solar C22 MW0.2 km
High Desert Power Plant960 MW2.6 km
Foundation Cemex River Plant3 MW3.9 km
Adelanto Solar II, LLC7 MW4.3 km
Adelanto Solar, LLC20 MW4.3 km