San Bernardino County, California · EIA plant ID 58101 · Operator: Foundation CA Fund VI Manager LLC
WindOnshore Wind TurbineCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor13%wind units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%2012201420162018202020222024202612.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120.14.8%—
20132.69.4%—
20142.79.6%—
20152.69.2%—
20162.910.3%—
20173.311.9%—
20182.910.5%—
20193.211.5%—
20202.910.4%—
20213.311.6%—
20222.810.1%—
20233.311.7%—
20243.111.1%—
20253.512.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WTG1Onshore Wind TurbineWT1.61.6Dec 2012Operating—ge 1.6 XLE
WTG2Onshore Wind TurbineWT1.61.6Dec 2012Operating—ge 1.6 XLE

Owner / operator

Operator: Foundation CA Fund VI Manager LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Foundation CA Fund VI Owner, LLC100.0%3 MW

Nearby plants

Within 80 km.
Expressway Solar B2 MW3.8 km
Expressway Solar A2 MW3.9 km
Expressway Solar C22 MW4 km
High Desert Power Plant960 MW6.4 km
Adelanto Solar, LLC20 MW6.5 km