Adelanto Solar II, LLC

San Bernardino County, California · EIA plant ID 59440 · Operator: Adelanto Solar II, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate7MWSummer 7 MW
Generators1in service
Net generation18GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202629.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201510.233.1%—
201617.228.0%—
201718.630.3%—
201818.930.8%—
201918.329.8%—
202016.426.7%—
202117.328.2%—
202216.627.0%—
20231727.8%—
202414.423.5%—
20251829.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SASSolar PhotovoltaicPV77Jul 2015Operating—coming soon

Owner / operator

Operator: Adelanto Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Adelanto Solar II, LLC100.0%7 MW

Nearby plants

Within 80 km.
Adelanto Solar, LLC20 MW0 km
Expressway Solar A2 MW4.3 km
High Desert Power Plant960 MW4.4 km
Expressway Solar B2 MW4.5 km
Expressway Solar C22 MW4.5 km
Victor Mesa Linda B22 MW5 km