← Back to map

Celina Solar Project #1, LLC

Mercer County, Ohio · EIA plant ID 58665 · Operator: Agilitas Energy, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate4MWSummer 4 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20142015201620172018202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202618.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20146.117.5%—
20156.117.3%—
20166.217.5%—
20174.813.8%—
20185.515.7%—
20204.111.7%—
20215.916.8%—
20226.418.4%—
20236.518.7%—
20246.518.4%—
20256.518.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CSP1Solar PhotovoltaicPV44Dec 2012Operating—coming soon

Owner / operator

Operator: Agilitas Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Agilitas Energy, LLC100.0%4 MW

Nearby plants

Within 80 km.
St Marys25 MW17 km
HMW Minster PV I3 MW23.1 km
HMV Minster Energy Storage System7 MW23.3 km
Minster 31 MW23.4 km
New Knoxvilleretired24.2 km
Wapakoneta-Pratt14 MW34.1 km