New KnoxvilleRetired
Auglaize County, Ohio · EIA plant ID 7898 · Operator: Village of New Knoxville
×1 MW oil retired since 2020 (latest Nov 2022)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2002 | 0 | 0.1% | 11,500 |
| 2003 | 0 | 0.2% | 6,429 |
| 2004 | 0 | 0.1% | 9,250 |
| 2005 | 0 | 0.3% | 11,178 |
| 2006 | 0 | 0.2% | 9,945 |
| 2007 | 0 | 0.1% | 15,400 |
| 2008 | 0 | 0.1% | 10,667 |
| 2009 | 0 | 0.1% | 10,538 |
| 2010 | 0 | 0.1% | 11,400 |
| 2011 | 0 | 0.1% | 12,231 |
| 2012 | 0 | 0.1% | 12,615 |
| 2013 | 0 | 0.2% | 16,667 |
| 2014 | 0 | 0.0% | 15,306 |
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 1.1 | 1 | Sep 2000 | Retired Nov 2022 | — | coming soon |
Owner / operator
Operator: Village of New Knoxville. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| St Marys | 25 MW | 8.5 km |
| Wapakoneta-Pratt | 14 MW | 11.5 km |
| HMV Minster Energy Storage System | 7 MW | 13 km |
| Minster 3 | 1 MW | 14.3 km |
| HMW Minster PV I | 3 MW | 14.4 km |
| DG AMP Solar Jackson Center | 2 MW | 23 km |