HMW Minster PV I
Auglaize County, Ohio · EIA plant ID 60190 · Operator: Madison Energy Holdings LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2015
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 0 | 0.2% | — |
| 2016 | 5.2 | 19.7% | — |
| 2017 | 5.1 | 19.4% | — |
| 2018 | 5 | 19.0% | — |
| 2019 | 4.8 | 18.1% | — |
| 2020 | 5 | 18.9% | — |
| 2021 | 8.4 | 31.9% | — |
| 2022 | 8.4 | 32.1% | — |
| 2023 | 8.2 | 31.3% | — |
| 2024 | 8.3 | 31.3% | — |
| 2025 | 7.7 | 29.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| MIN01 | Solar Photovoltaic | PV | 3 | 3 | Dec 2015 | Operating | — | coming soon |
Owner / operator
Operator: Madison Energy Holdings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Madison Energy Holdings LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Minster 3 | 1 MW | 0.3 km |
| HMV Minster Energy Storage System | 7 MW | 1.5 km |
| New Knoxville | retired | 14.4 km |
| St Marys | 25 MW | 17.3 km |
| Versailles Peaking | 5 MW | 19.5 km |
| DG AMP Solar Versailles | 2 MW | 20.6 km |