← Back to map

Otoe Solar Power Generation Station 1 LL

San Bernardino County, California · EIA plant ID 58612 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202626.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201300.0%—
20143.627.6%—
20153.727.9%—
20163.627.1%—
20173.526.8%—
20183.627.6%—
20193.526.6%—
20203.526.2%—
20212.519.2%—
20223.627.1%—
20233.526.8%—
20243.426.0%—
20253.526.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.51.5Dec 2013Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Navajo Solar Power Generation Station 1 LLC2 MW0.7 km
Nunn1 MW5.3 km
SunEdison Walmart Apple Valley DC1 MW5.9 km
Powhatan Solar Power Generation Station 1 LLC2 MW6.9 km
Victor Valley CC CPV Solar1 MW9.4 km
Foundation Cemex River Plant3 MW10.7 km