← Back to map

Victor Valley CC CPV SolarOut of service

San Bernardino County, California · EIA plant ID 57254 · Operator: Victor Valley Community College District
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2010201120122013201420152016201720182019202020212022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2010201220142016201820202022

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20102.752.4%—
20112.730.5%—
20122.730.4%—
20132.225.3%—
2014222.5%—
20151.922.1%—
20161.718.8%—
20171.112.4%—
20181.112.7%—
20191.213.8%—
20201.415.7%—
20212.224.8%—
20222.832.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1PVSolar PhotovoltaicPV11Jun 2010Operating (Out of service)—coming soon

Owner / operator

Operator: Victor Valley Community College District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Victor Valley Community College District100.0%1 MW

Nearby plants

Within 80 km.
Otoe Solar Power Generation Station 1 LL2 MW9.4 km
Navajo Solar Power Generation Station 1 LLC2 MW10 km
Nunn1 MW10 km
Foundation Cemex River Plant3 MW10.2 km
Powhatan Solar Power Generation Station 1 LLC2 MW10.5 km
Hesperia2 MW12.1 km