← Back to map

Industry Solar Power Generation Station 1 LLC

San Bernardino County, California · EIA plant ID 58609 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202633.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201300.0%—
2014430.6%—
20154.332.5%—
20164.433.7%—
20174.131.5%—
20184.231.6%—
20194.231.9%—
20204.131.1%—
20214.231.6%—
20224.333.1%—
20234.232.0%—
2024430.5%—
20254.333.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ISP1Solar PhotovoltaicPV1.51.5Dec 2013Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Coronus Adelanto West 22 MW0.9 km
Coronus Adelanto West 12 MW0.9 km
Adelanto Solar Project7 MW2 km
RE Victor Phelan Solar One LLC20 MW4.9 km
Baldy Mesa Storage—5.6 km
Victor Dry Farm Ranch A5 MW5.8 km