← Back to map

Victor Dry Farm Ranch A

San Bernardino County, California · EIA plant ID 58418 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202622.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20154.919.1%—
201610.724.3%—
20171022.9%—
201810.123.0%—
20191022.8%—
20209.521.6%—
20211022.8%—
202210.123.2%—
20238.820.1%—
20249.722.1%—
20259.722.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV55Jun 2015Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FTP Solar LLC100.0%5 MW

Nearby plants

Within 80 km.
Victor Dry Farm Ranch B5 MW0.6 km
RE Victor Phelan Solar One LLC20 MW1.6 km
Coronus Adelanto West 22 MW5.2 km
Coronus Adelanto West 12 MW5.2 km
Industry Solar Power Generation Station 1 LLC2 MW5.8 km
Adelanto Solar Project7 MW6.2 km