RE Victor Phelan Solar One LLC

San Bernardino County, California · EIA plant ID 58202 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation45GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202625.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20132.214.9%—
201451.429.3%—
201547.727.2%—
201649.728.3%—
201747.227.0%—
201847.226.9%—
201943.524.8%—
202044.125.1%—
202145.526.0%—
202242.124.0%—
202339.522.6%—
202444.725.4%—
202545.125.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
VPS1Solar PhotovoltaicPV2020Dec 2013Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RE Victor Phelan Solar One LLC100.0%20 MW

Nearby plants

Within 80 km.
Victor Dry Farm Ranch A5 MW1.6 km
Victor Dry Farm Ranch B5 MW1.7 km
Coronus Adelanto West 12 MW4.2 km
Coronus Adelanto West 22 MW4.2 km
Industry Solar Power Generation Station 1 LLC2 MW4.9 km
Adelanto Solar Project7 MW5.8 km