Cedar Valley Solar Plant

Iron County, Utah · EIA plant ID 58599 · Operator: First Wind O&M, LLC
SolarSolar PhotovoltaicBA: PACE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202624.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201502.1%—
20163.111.9%—
20175.721.6%—
2018622.7%—
20195.822.1%—
2020622.7%—
2021622.7%—
20226.424.3%—
20235.922.4%—
2024622.9%—
20256.224.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CVSP1Solar PhotovoltaicPV32.9Dec 2015Operating—coming soon

Owner / operator

Operator: First Wind O&M, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
First Wind O&M, LLC100.0%3 MW

Nearby plants

Within 80 km.
Three Peaks Power80 MW4.7 km
Appaloosa Solar I200 MW5.4 km
Iron Springs BESS80 MW10.2 km
Iron Springs Solar, LLC80 MW11 km
Granite Mountain Solar East, LLC80 MW12.5 km
Fiddler's Canyon 33 MW14 km