← Back to map

Tucannon River Wind Farm

Columbia County, Washington · EIA plant ID 58571 · Operator: Portland General Electric Co
WindOnshore Wind TurbineBA: PGE
Nameplate267MWSummer 267 MW
Generators1in service
Net generation737GWh12 mo to Dec 2025
Capacity factor32%wind units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202631.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2015758.232.4%—
2016869.437.1%—
2017710.130.4%—
2018843.736.1%—
2019723.530.9%—
2020941.740.2%—
2021866.137.1%—
2022738.131.6%—
2023678.529.0%—
2024808.334.5%—
2025736.831.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT266.8266.8Dec 2014Operating—siemens SWT-2.3-108

Owner / operator

Operator: Portland General Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Portland General Electric Co100.0%267 MW

Nearby plants

Within 80 km.
Hopkins Ridge Wind157 MW14.9 km
Lower Snake Solar Generation BESS—17.8 km
Little Goose810 MW18.1 km
Lower Snake River Wind Energy Project343 MW19.5 km
Marengo Wind Plant234 MW19.8 km
Twin Reservoirs2 MW40.9 km