WindOnshore Wind TurbineBA: PACW
Nameplate234MWSummer 234 MW
Generators2in service
Net generation613GWh12 mo to Dec 2025
Capacity factor30%wind units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201020152020202529.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2007160.631.2%—
2008478.725.9%—
2009474.825.7%—
2010496.426.9%—
2011597.832.4%—
2012536.229.0%—
2013485.926.3%—
2014542.329.4%—
2015436.723.7%—
2016526.428.5%—
2017468.925.4%—
2018500.927.2%—
2019234.712.7%—
2020648.831.6%—
2021732.335.7%—
2022588.128.7%—
2023560.627.4%—
2024692.733.7%—
2025612.629.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT156156Aug 2007Operating—vestas V100-2.0
2Onshore Wind TurbineWT7878Jan 2008Operating—vestas V100-2.0

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%234 MW

Nearby plants

Within 80 km.
Hopkins Ridge Wind157 MW6.7 km
Lower Snake Solar Generation BESS—14.7 km
Lower Snake River Wind Energy Project343 MW17 km
Tucannon River Wind Farm267 MW19.8 km
Little Goose810 MW30.1 km
Lower Granite810 MW41.4 km