← Back to map

Gridley Main

Butte County, California · EIA plant ID 58370 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202616.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20132.128.9%—
20141.921.9%—
20152.224.7%—
20161.820.4%—
2017223.0%—
2018222.3%—
20191.516.8%—
20201.314.5%—
20211.820.8%—
20221.820.6%—
20231.618.1%—
20241.618.7%—
20251.416.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV11Mar 2013Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%1 MW

Nearby plants

Within 80 km.
Gridley Main Two3 MW0.2 km
2127 Harris Solar Project1 MW9.2 km
Thermalito115 MW16.4 km
Oroville Cogeneration LP8 MW16.8 km
Thermalito Diverson Dam3 MW20.9 km
Tierra Buena Energy Storage5 MW22.5 km