← Back to map

Thermalito Diverson Dam

Butte County, California · EIA plant ID 7129 · Operator: California Dept. of Water Resources
HydroConventional HydroelectricCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor39%hydro units, summer MW
Heat rate—thermal plants only
First online1987

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-10123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202539.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20012179.8%—
200218.972.0%—
200323.188.0%—
200420.577.6%—
200514.253.9%—
20068.733.3%—
20071972.3%—
20081349.3%—
200922.786.3%—
20109.235.0%—
201111.343.1%—
20122179.7%—
201316.261.6%—
201419.574.0%—
201519.975.9%—
201620.377.1%—
20171349.4%—
201820.577.9%—
201916.261.6%—
202013.250.3%—
202110.941.3%—
202219.875.3%—
202316.562.6%—
202419.273.0%—
202510.339.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TD1Conventional HydroelectricHY3.43Jul 1987Operating—coming soon

Owner / operator

Operator: California Dept. of Water Resources. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
California Dept. of Water Resources100.0%3 MW

Nearby plants

Within 80 km.
Oroville Cogeneration LP8 MW4.3 km
Kelly Ridge10 MW4.7 km
Edward C Hyatt644 MW4.9 km
Thermalito115 MW7.3 km
Butte College Main Campus Solar4 MW15.7 km
Lime Saddleretired19 km