← Back to map

Walmart Casa GrandeRetired

Pinal County, Arizona · EIA plant ID 57939 · Operator: SolarCity Corporation
SolarBA: AZPS

×2 MW solar retired since 2020 (latest Sep 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2011201220132014201520162017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20112.126.8%—
20123.728.0%—
20133.520.2%—
20143.318.9%—
20153.218.0%—
20163.218.4%—
2017317.1%—
20181.48.2%—
20192.615.0%—
20202.212.3%—
20212.212.5%—
20222.413.5%—
20231.810.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Jun 2011Retired Sep 2023—coming soon
2Solar PhotovoltaicPV11Jun 2011Retired Sep 2023—coming soon

Owner / operator

Operator: SolarCity Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Desert Basin745 MW4.5 km
Vista Grande HS at Casa Grande1 MW6.1 km
Union HS at Casa Grande2 MW8.4 km
Eleven Mile Solar Center600 MW16.8 km
Sundance695 MW18.3 km
Central Line Solar, LLC100 MW19.4 km