Pinal County, Arizona · EIA plant ID 64566 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: SRP
Nameplate100MWSummer 100 MW
Generators1in service
Net generation248GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20222023202420252026202728.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022218.833.1%—
2023263.730.1%—
2024266.530.3%—
2025269.430.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CNTRLSolar PhotovoltaicPV100100Apr 2022Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%100 MW

Nearby plants

Within 80 km.
East Line Solar100 MW1.4 km
Eleven Mile Solar Center600 MW3.7 km
Selma Energy Center—4.4 km
Pinal Central Energy Center Hybrid30 MW4.9 km
Saint Energy Storage II LLC100 MW6.4 km
Saint Solar100 MW7.1 km