← Back to map

San Emidio

Washoe County, Nevada · EIA plant ID 57456 · Operator: USG Nevada LLC
GeothermalGeothermalBA: NEVP
Nameplate12MWSummer 6 MW
Generators1in service
Net generation76GWh12 mo to Dec 2025
Capacity factor145%!geothermal units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%150%20122014201620182020202220242026145.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20123028.5%—
201376.6143.4%—
201476.9143.9%—
201579.5144.1%—
201675147.3%—
201766.6158.4%—
201864.4122.6%—
201973.4139.6%—
202088.9168.7%—
202188.9169.1%—
202285.7163.0%—
202383157.8%—
202483.8159.1%—
202576.4145.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SE-U1GeothermalST11.86May 2012Operating—coming soon

Owner / operator

Operator: USG Nevada LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
USG Nevada LLC100.0%12 MW

Nearby plants

Within 80 km.
North Valley37 MW5.4 km
Dodge Flat250 MW37.4 km
Fish Springs125 MW59.5 km
Amedee Geothermal Venture I—60.4 km
Sierra Solar Hybrid400 MW66.1 km
PSREC/SIAD Solar3 MW66.5 km