← Back to map

PSREC/SIAD Solar

Lassen County, California · EIA plant ID 63493 · Operator: Plumas Sierra Rural Electric Coop
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 2 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202626.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.15.3%—
20206.128.7%—
2021628.5%—
20226.128.8%—
20235.224.5%—
20246.229.3%—
20255.626.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SIADSolar PhotovoltaicPV2.52.4Sep 2018Operating—coming soon

Owner / operator

Operator: Plumas Sierra Rural Electric Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Plumas Sierra Rural Electric Coop100.0%3 MW

Nearby plants

Within 80 km.
Fish Springs125 MW15.2 km
Amedee Geothermal Venture I—16.8 km
HL Power36 MW27.1 km
HL Solar8 MW27.4 km
High Sierra Cogeneration Plant6 MW41.9 km
Sierra Pacific Loyalton Facilityretired54.3 km