← Back to map

Sierra Solar Hybrid

Churchill County, Nevada · EIA plant ID 67978 · Operator: Sierra Pacific Power Co
BatteryBatteriesBA: NEVP

400 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate400MWSummer 400 MW
Generators1in service · 400 MW building
Net generation-21GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-5-4-3-2-10GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SSES1BatteriesBA400400Mar 2026Operating—coming soon
SSPV1Solar PhotovoltaicPV400400planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Sierra Pacific Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sierra Pacific Power Co100.0%400 MW

Nearby plants

Within 80 km.
Brady30 MW6.9 km
Desert Peak Power Plant26 MW13.3 km
Patua Acquisition Project, LLC59 MW29.9 km
Soda Lake 326 MW37 km
Soda Lake Geothermal No I IIretired37.2 km
New Lahontan4 MW43.4 km