Patua Acquisition Project, LLC

Churchill County, Nevada · EIA plant ID 58319 · Operator: Patua Project LLC
GeothermalGeothermalSolar PhotovoltaicBA: NEVP
Nameplate59MWSummer 41 MW
Generators4in service
Net generation103GWh12 mo to Dec 2025
Capacity factor30%geothermal units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%201420162018202020222024202629.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.77.7%—
2014116.344.3%—
201512146.1%—
2016115.543.8%—
2017124.942.3%—
201813842.2%—
2019150.747.7%—
2020145.945.1%—
2021136.141.5%—
2022126.337.7%—
2023137.142.3%—
2024133.540.8%—
2025103.329.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1GeothermalBT1610Dec 2013Operating—coming soon
3GeothermalBT1610Dec 2013Operating—coming soon
5GeothermalBT1610Dec 2013Operating—coming soon
PV-01Solar PhotovoltaicPV10.610.6Jul 2017Operating—coming soon

Owner / operator

Operator: Patua Project LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Patua Project LLC100.0%59 MW

Nearby plants

Within 80 km.
New Lahontan4 MW13.6 km
Lahontan2 MW13.7 km
Soda Lake 326 MW19.4 km
Soda Lake Geothermal No I IIretired20.4 km
Desert Peak Power Plant26 MW21.3 km
Brady30 MW24 km