San Luis Valley Solar Ranch

Alamosa County, Colorado · EIA plant ID 57317 · Operator: Avangrid Renewables Inc
SolarSolar PhotovoltaicBA: PSCO
Nameplate35MWSummer 35 MW
Generators1in service
Net generation60GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2011

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202619.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20112.610.0%—
201277.50.0%—
201372.723.7%—
201478.525.6%—
201573.824.1%—
201677.225.1%—
201776.324.9%—
201877.725.3%—
201972.823.8%—
202076.524.9%—
202165.721.4%—
202264.521.0%—
202372.823.7%—
202471.823.3%—
20256621.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV3535Dec 2011Operating—coming soon

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Avangrid Renewables Inc100.0%35 MW

Nearby plants

Within 80 km.
Greater Sandhill I19 MW3.4 km
SunE Alamosa8 MW4.2 km
Hooper Solar52 MW5.6 km
Cogentrix of Alamosa30 MW11 km
Centerretired16.9 km
Monte Vista Solar 2 CSG, LLC2 MW20.4 km