← Back to map

Cogentrix of Alamosa

Alamosa County, Colorado · EIA plant ID 57368 · Operator: Alamosa Operating Services LLC
SolarSolar PhotovoltaicBA: PSCO
Nameplate30MWSummer 30 MW
Generators1in service
Net generation77GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201320142015201620172018201920202021202220232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2012201420162018202020222024202629.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201254.127.3%—
201365.625.0%—
201463.724.2%—
201558.922.4%—
201663.824.2%—
201759.222.5%—
201859.122.5%—
201954.820.9%—
202054.220.6%—
202143.916.7%—
202241.115.6%—
202335.113.4%—
202576.629.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV3030Apr 2012Operating—coming soon

Owner / operator

Operator: Alamosa Operating Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Alamosa Enhanced, LLC100.0%30 MW

Nearby plants

Within 80 km.
Hooper Solar52 MW10.8 km
San Luis Valley Solar Ranch35 MW11 km
Greater Sandhill I19 MW11.2 km
SunE Alamosa8 MW12.2 km
Monte Vista Solar 2 CSG, LLC2 MW13 km
San Luis Valley Regional Medical Center1 MW15.1 km