← Back to map

CenterRetired

Saguache County, Colorado · EIA plant ID 491 · Operator: City of Center - (CO)
OilBA: PSCO

×2 MW oil retired since 2020 (latest Jan 2021)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.20.40.60.81MWh2002200420062008201020122014201620182020

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%100%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200200.0%—
200300.0%—
200400.0%—
200500.0%—
200600.0%—
200700.0%—
200800.0%—
200900.0%—
201000.0%—
201100.0%—
201200.0%—
201300.0%—
201400.0%—
201500.0%—
201600.0%—
201700.0%—
201800.0%—
201900.0%—
202000.0%—
20210——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3Petroleum LiquidsIC0.50.5Jul 1963Retired Jan 2021—coming soon
5Petroleum LiquidsIC11Aug 1959Retired Jan 2021—coming soon

Owner / operator

Operator: City of Center - (CO). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
San Luis Valley Solar Array3 MW10.5 km
Hooper Solar52 MW12.1 km
San Luis Valley Solar Ranch35 MW16.9 km
Monte Vista Solar 2 CSG, LLC2 MW20.2 km
Greater Sandhill I19 MW20.3 km
SunE Alamosa8 MW20.9 km