Nameplate252MWSummer 252 MW
Generators1in service
Net generation653GWh12 mo to Aug 2026
Capacity factor30%wind units, summer MW
Heat rate—thermal plants only
First online2011
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 316 | 22.1% | — |
| 2012 | 867.7 | 40.6% | — |
| 2013 | 757.5 | 35.6% | — |
| 2014 | 764.2 | 35.9% | — |
| 2015 | 645 | 29.9% | — |
| 2016 | 661.3 | 29.9% | — |
| 2017 | 743.7 | 33.7% | — |
| 2018 | 726.7 | 32.9% | — |
| 2019 | 590 | 26.7% | — |
| 2020 | 710.2 | 32.1% | — |
| 2021 | 496 | 22.5% | — |
| 2022 | 494.7 | 22.4% | — |
| 2023 | 589.7 | 26.7% | — |
| 2024 | 670.5 | 30.3% | — |
| 2025 | 692.6 | 31.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1-139 | Onshore Wind Turbine | WT | 252 | 252 | May 2011 | Operating | — | vestas V90-1.8 |
Owner / operator
Operator: Cedar Point LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cedar Point LLC | 51.0% | 129 MW |
| Clover US Blocker LLC | 49.0% | 124 MW |
Nearby plants
Within 80 km.
| Limon Wind I | 200 MW | 10.1 km |
| Limon Wind II | 200 MW | 12.2 km |
| Limon III Wind LLC | 201 MW | 19.1 km |
| Limon Generating Station | 154 MW | 24.3 km |
| Rush Creek Wind | 600 MW | 31.3 km |
| Titan Solar | 50 MW | 41.2 km |