← Back to map

Rush Creek Wind

Elbert County, Colorado · EIA plant ID 60619 · Operator: Public Service Co of Colorado
WindOnshore Wind TurbineBA: PSCO
Nameplate600MWSummer 600 MW
Generators1in service
Net generation2,175GWh12 mo to Aug 2026
Capacity factor41%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202641.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018194.543.6%—
20191,975.137.6%—
20202,024.338.4%—
20212,128.341.7%—
20222,251.444.1%—
20232,110.341.4%—
20242,254.444.1%—
20252,149.640.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Onshore Wind TurbineWT600600Dec 2018Operating—vestas V100-2.0

Owner / operator

Operator: Public Service Co of Colorado. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Public Service Co of Colorado100.0%600 MW

Nearby plants

Within 80 km.
Limon Generating Station154 MW13 km
Limon Wind II200 MW29.5 km
Cedar Point Wind252 MW31.3 km
Limon Wind I200 MW33 km
Limon III Wind LLC201 MW37.8 km
Golden West Power Partners LLC250 MW41.2 km