← Back to map

Occidental College Solar Project

Los Angeles County, California · EIA plant ID 57311 · Operator: Occidental College
SolarSolar PhotovoltaicBA: LDWP
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh20142015201620172018201920202021202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202618.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20131.619.5%—
20141.820.7%—
20151.820.5%—
20161.921.1%—
20171.821.1%—
20181.820.9%—
20191.820.2%—
20201.718.9%—
20211.820.5%—
20231.617.8%—
20241.314.6%—
20251.618.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV11Feb 2013Operating—coming soon

Owner / operator

Operator: Occidental College. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Occidental College100.0%1 MW

Nearby plants

Within 80 km.
Scholl Canyon—3.4 km
Glenarm266 MW5.3 km
Glenarm BESS Plant—5.5 km
Forever 21 Retail, Inc.1 MW6.4 km
Grayson189 MW7.2 km
Ratkovich Alhambra1 MW7.3 km