← Back to map

Arrowrock Hydroelectric Project

Elmore County, Idaho · EIA plant ID 56997 · Operator: Boise-Kuna Irrigation District
HydroConventional HydroelectricBA: IPCO
Nameplate15MWSummer 16 MW
Generators2in service
Net generation63GWh12 mo to Dec 2025
Capacity factor45%hydro units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20102012201420162018202020222024202645.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201077.673.5%—
201184.960.6%—
201275.954.0%—
201348.934.9%—
201472.751.8%—
201565.446.7%—
201666.847.5%—
201780.957.7%—
201877.355.1%—
201959.742.6%—
202067.347.9%—
202138.227.3%—
202253.438.1%—
202355.939.9%—
20247352.0%—
202563.245.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY7.58Apr 2010Operating—coming soon
2Conventional HydroelectricHY7.58Apr 2010Operating—coming soon

Owner / operator

Operator: Boise-Kuna Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boise-Kuna Irrigation District100.0%15 MW

Nearby plants

Within 80 km.
Lucky Peak Power Plant Project101 MW13.2 km
Boise R Diversion3 MW15.1 km
Barber Dam4 MW16.4 km
Boise Bench BESS150 MW19.1 km
Blacks Creek Solar—24.1 km
Pleasant Valley Solar 2 Project125 MW30.2 km