Barber Dam

Ada County, Idaho · EIA plant ID 10735 · Operator: Barber Pool Hydro LLC
HydroConventional HydroelectricBA: IPCO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor19%hydro units, summer MW
Heat rate—thermal plants only
First online1990

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202519.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20017.421.2%—
200210.329.4%—
200310.630.3%—
200411.332.1%—
20059.727.8%—
200618.653.0%—
200710.429.8%—
200811.131.7%—
200911.733.3%—
201011.532.8%—
201114.140.3%—
201214.741.9%—
2013925.6%—
201410.429.5%—
20159.426.9%—
201612.234.6%—
201713.337.9%—
201812.134.4%—
201913.137.3%—
20204.713.3%—
20214.111.6%—
20223.911.2%—
20239.226.1%—
20246.719.2%—
20256.719.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY4.14Aug 1990Operating—coming soon

Owner / operator

Operator: Barber Pool Hydro LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Barber Pool Hydro LLC100.0%4 MW

Nearby plants

Within 80 km.
Boise Bench BESS150 MW2.7 km
Boise R Diversion3 MW3.4 km
Lucky Peak Power Plant Project101 MW6.3 km
Blacks Creek Solar—8.9 km
Arrowrock Hydroelectric Project15 MW16.4 km
Orchard Ranch Solar20 MW16.8 km