Lucky Peak Power Plant Project

Ada County, Idaho · EIA plant ID 10014 · Operator: Boise-Kuna Irrigation District
HydroConventional HydroelectricBA: IPCO
Nameplate101MWSummer 83 MW
Generators3in service
Net generation311GWh12 mo to Dec 2025
Capacity factor43%hydro units, summer MW
Heat rate—thermal plants only
First online1988

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202542.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001188.433.3%—
2002288.844.2%—
2003292.444.7%—
200432538.5%—
2005226.226.9%—
2006406.855.9%—
2007272.637.5%—
200831142.7%—
2009321.844.3%—
2010285.639.3%—
2011388.853.5%—
2012401.355.0%—
2013215.529.6%—
2014308.142.4%—
2015277.938.2%—
2016340.346.7%—
2017463.363.7%—
2018347.647.8%—
2019363.950.0%—
2020254.434.9%—
2021221.730.5%—
2022233.732.1%—
2023331.845.6%—
2024290.639.9%—
2025311.242.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
U131Conventional HydroelectricHY4536.2Oct 1988Operating—coming soon
U132Conventional HydroelectricHY4536.2Oct 1988Operating—coming soon
U133Conventional HydroelectricHY11.210.6Oct 1988Operating—coming soon

Owner / operator

Operator: Boise-Kuna Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boise-Kuna Irrigation District100.0%101 MW

Nearby plants

Within 80 km.
Boise R Diversion3 MW3.1 km
Barber Dam4 MW6.3 km
Boise Bench BESS150 MW8.4 km
Blacks Creek Solar—11.2 km
Arrowrock Hydroelectric Project15 MW13.2 km
Orchard Ranch Solar20 MW19.5 km