Solar Photovoltaic Project #02Retired

San Bernardino County, California · EIA plant ID 56996 · Operator: Southern California Edison Co
SolarCAISOBA: CISO

×1 MW solar retired since 2020 (latest Dec 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150200MWh200920102011201220132014201520162017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20102012201420162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20090.17.1%—
20101.416.2%—
20111.315.0%—
20120.910.1%—
2013110.9%—
20140.89.0%—
20150.78.0%—
20160.910.2%—
20170.66.6%—
20180.44.2%—
20190.77.5%—
20200.78.2%—
20211.213.6%—
20220.78.1%—
2023-0-0.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S1ASolar PhotovoltaicPV0.50.5Dec 2009Retired Dec 2023—coming soon
S1BSolar PhotovoltaicPV0.50.5Dec 2009Retired Dec 2023—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
OLS Energy Chino31 MW1.9 km
San Antonio West Solar Rooftop2 MW4.4 km
CA Institute for Women1 MW7.1 km
KP Ontario Vineyard Solar2 MW10 km
Kaiser Ontario1 MW10 km
Terra Francesco2 MW10.6 km