← Back to map

San Antonio West Solar Rooftop

Riverside County, California · EIA plant ID 57904 · Operator: SS San Antonio West LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2012

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2012201420162018202020222024202617.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20121.425.5%—
20133.224.4%—
20143.123.3%—
20152.922.4%—
20162.720.2%—
20172.921.8%—
20182.821.5%—
20191.713.2%—
20202.418.6%—
20211.511.6%—
20221.511.7%—
20231.612.0%—
20241.713.0%—
20252.317.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CHNOSolar PhotovoltaicPV1.51.5Aug 2012Operating—coming soon

Owner / operator

Operator: SS San Antonio West LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SS San Antonio West LLC100.0%2 MW

Nearby plants

Within 80 km.
CA Institute for Women1 MW2.7 km
OLS Energy Chino31 MW3.3 km
Solar Photovoltaic Project #02retired4.4 km
KP Ontario Vineyard Solar2 MW8.7 km
Kaiser Ontario1 MW8.8 km
Niagara Bottling Ontario PHI3 MW9.4 km