← Back to map

Hackberry Wind Farm

Shackelford County, Texas · EIA plant ID 56823 · Operator: Hackberry Wind LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate166MWSummer 162 MW
Generators1in service
Net generation228GWh12 mo to Dec 2025
Capacity factor16%wind units, summer MW
Heat rate—thermal plants only
First online2008

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201020152020202516.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200844.436.8%—
2009498.835.1%—
2010441.331.0%—
201135525.0%—
2012435.830.6%—
2013482.133.9%—
2014514.536.2%—
2015441.331.0%—
2016459.532.2%—
2017436.630.7%—
2018361.625.4%—
2019463.332.6%—
2020418.229.3%—
202138427.0%—
2022333.623.5%—
2023352.424.8%—
2024325.722.8%—
2025228.416.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HWFG1Onshore Wind TurbineWT165.6162.3Dec 2008Operating—siemens SWT-2.3-93

Owner / operator

Operator: Hackberry Wind LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hackberry Wind LLC100.0%166 MW

Nearby plants

Within 80 km.
Mesquite Wind Power LLC200 MW17.2 km
Funston Solar—27.9 km
Quantum BESS—30 km
Quantum Solar—30.1 km
Azure Sky Solar316 MW31.4 km
OCI Alamo 7 LLC100 MW32.5 km