← Back to map

OCI Alamo 7 LLC

Haskell County, Texas · EIA plant ID 59207 · Operator: RWE Clean Energy
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate100MWSummer 100 MW
Generators1in service
Net generation232GWh12 mo to Dec 2025
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202626.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201670.119.1%—
2017284.232.4%—
2018284.232.4%—
201925228.8%—
2020262.829.9%—
2021250.728.6%—
2022256.329.3%—
2023250.228.6%—
2024245.327.9%—
2025231.626.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OCIA7Solar PhotovoltaicPV100100Aug 2016Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%100 MW

Nearby plants

Within 80 km.
Quantum Solar—3.1 km
Quantum BESS—3.2 km
Azure Sky Solar316 MW7.3 km
Quantum II BESS—10.7 km
Quantum II Solar—11 km
Briggs Solar, LLC—11.6 km