Goodnoe Hills
Klickitat County, Washington · EIA plant ID 56666 · Operator: PacifiCorp
Nameplate103MWSummer 94 MW
Generators1in service
Net generation268GWh12 mo to Dec 2025
Capacity factor33%wind units, summer MW
Heat rate—thermal plants only
First online2008
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2008 | 147 | 30.4% | — |
| 2009 | 229 | 27.8% | — |
| 2010 | 212.3 | 25.8% | — |
| 2011 | 239.4 | 29.1% | — |
| 2012 | 221.2 | 26.8% | — |
| 2013 | 227.2 | 27.6% | — |
| 2014 | 216.8 | 26.3% | — |
| 2015 | 186.7 | 22.7% | — |
| 2016 | 223.9 | 27.1% | — |
| 2017 | 191.9 | 23.3% | — |
| 2018 | 230.5 | 28.0% | — |
| 2019 | 48 | 5.8% | — |
| 2020 | 326.8 | 39.6% | — |
| 2021 | 296.2 | 36.0% | — |
| 2022 | 265.8 | 32.3% | — |
| 2023 | 223.9 | 27.2% | — |
| 2024 | 275.5 | 33.4% | — |
| 2025 | 268.3 | 32.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 103.4 | 94 | Jun 2008 | Operating | — | vestas V110-2.0 |
Owner / operator
Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PacifiCorp | 100.0% | 103 MW |
Nearby plants
Within 80 km.
| Harvest Wind Project | 99 MW | 13.9 km |
| White Creek Wind Farm | 204 MW | 14.4 km |
| John Day | 2,160 MW | 15.3 km |
| Biglow Canyon Wind Farm | 450 MW | 15.6 km |
| Lund Hill Solar | 150 MW | 17.5 km |
| Wheat Field Wind Power Project | 103 MW | 19.7 km |