← Back to map

Wheat Field Wind Power Project

Gilliam County, Oregon · EIA plant ID 56854 · Operator: Wheat Field Wind Power Project LLC
WindOnshore Wind TurbineBA: BPAT
Nameplate103MWSummer 103 MW
Generators1in service
Net generation198GWh12 mo to Dec 2025
Capacity factor22%wind units, summer MW
Heat rate—thermal plants only
First online2009

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201020152020202521.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2009173.622.3%—
2010198.123.3%—
2011229.327.0%—
2012206.424.2%—
2013213.925.2%—
2014222.126.2%—
2015180.721.4%—
201619923.5%—
2017179.421.2%—
201821525.4%—
2019183.921.7%—
202024128.4%—
2021219.424.3%—
202219221.3%—
2023190.821.2%—
202419821.9%—
2025197.521.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Onshore Wind TurbineWT102.9102.9Feb 2009Operating—suzlon S88-2100

Owner / operator

Operator: Wheat Field Wind Power Project LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wheat Field Wind Power Project LLC100.0%103 MW

Nearby plants

Within 80 km.
Leaning Juniper Wind Power II199 MW5.3 km
Leaning Juniper110 MW8.8 km
Arlington Wind Power Project103 MW10.2 km
Waste Management Columbia Ridge LFGTE13 MW11.5 km
Harvest Wind Project99 MW15.4 km
Pebble Springs Wind LLC99 MW15.5 km