Leaning Juniper
Gilliam County, Oregon · EIA plant ID 56360 · Operator: PacifiCorp
Nameplate110MWSummer 101 MW
Generators1in service
Net generation270GWh12 mo to Dec 2025
Capacity factor31%wind units, summer MW
Heat rate—thermal plants only
First online2006
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2006 | 67.6 | 30.4% | — |
| 2007 | 290.5 | 33.0% | — |
| 2008 | 376.2 | 42.6% | — |
| 2009 | 258.7 | 29.4% | — |
| 2010 | 223.6 | 25.4% | — |
| 2011 | 234.8 | 26.7% | — |
| 2012 | 190.9 | 21.6% | — |
| 2013 | 206.2 | 22.7% | — |
| 2014 | 215.2 | 24.4% | — |
| 2015 | 188.6 | 21.4% | — |
| 2016 | 202.6 | 22.9% | — |
| 2017 | 155.7 | 17.7% | — |
| 2018 | 201.7 | 22.9% | — |
| 2019 | 98.2 | 11.2% | — |
| 2020 | 316.4 | 35.8% | — |
| 2021 | 293.6 | 33.4% | — |
| 2022 | 253.4 | 28.8% | — |
| 2023 | 254.7 | 28.9% | — |
| 2024 | 275.2 | 31.2% | — |
| 2025 | 269.5 | 30.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 110.4 | 100.5 | Oct 2006 | Operating | — | ge 1.6 SLE |
Owner / operator
Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| PacifiCorp | 100.0% | 110 MW |
Nearby plants
Within 80 km.
| Leaning Juniper Wind Power II | 199 MW | 3.9 km |
| Arlington Wind Power Project | 103 MW | 7.2 km |
| Wheat Field Wind Power Project | 103 MW | 8.8 km |
| Pebble Springs Wind LLC | 99 MW | 9.3 km |
| Waste Management Columbia Ridge LFGTE | 13 MW | 11.1 km |
| Oregon Trail Solar | — | 11.2 km |