Lund Hill Solar
Klickitat County, Washington · EIA plant ID 63509 · Operator: Avangrid Renewables Inc
Nameplate150MWSummer 150 MW
Generators1in service
Net generation369GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 31.6 | 9.6% | — |
| 2023 | 288.2 | 21.9% | — |
| 2024 | 353.6 | 26.8% | — |
| 2025 | 367.3 | 28.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LHS1 | Solar Photovoltaic | PV | 150 | 150 | Oct 2022 | Operating | — | coming soon |
Owner / operator
Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Avangrid Renewables Inc | 100.0% | 150 MW |
Nearby plants
Within 80 km.
| Bluebird Solar | — | 4.1 km |
| Big Horn Wind Project | 199 MW | 5.1 km |
| Big Horn Wind II | 50 MW | 5.3 km |
| White Creek Wind Farm | 204 MW | 8.1 km |
| Harvest Wind Project | 99 MW | 8.3 km |
| Juniper Canyon I Wind Project | 151 MW | 10 km |