Juniper Canyon I Wind Project
Klickitat County, Washington · EIA plant ID 57320 · Operator: Avangrid Renewables Inc
Nameplate151MWSummer 149 MW
Generators1in service
Net generation144GWh12 mo to Aug 2026
Capacity factor11%wind units, summer MW
Heat rate—thermal plants only
First online2011
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 219.9 | 19.8% | — |
| 2012 | 283.5 | 21.3% | — |
| 2013 | 325.1 | 24.6% | — |
| 2014 | 338.8 | 25.6% | — |
| 2015 | 307.4 | 23.2% | — |
| 2016 | 322.1 | 24.3% | — |
| 2017 | 297.2 | 22.4% | — |
| 2018 | 335.1 | 25.3% | — |
| 2019 | 301.6 | 22.8% | — |
| 2020 | 392.7 | 30.0% | — |
| 2021 | 348.3 | 26.7% | — |
| 2022 | 294.5 | 22.6% | — |
| 2023 | 235.6 | 18.1% | — |
| 2024 | 270.5 | 20.7% | — |
| 2025 | 144.2 | 11.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 151.2 | 148.8 | Mar 2011 | Operating | — | mitsubishi MWT-95/2.4 |
Owner / operator
Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Avangrid Renewables Inc | 100.0% | 151 MW |
Nearby plants
Within 80 km.
| Big Horn Wind II | 50 MW | 5.3 km |
| Big Horn Wind Project | 199 MW | 5.6 km |
| Bluebird Solar | — | 5.9 km |
| Lund Hill Solar | 150 MW | 10 km |
| White Creek Wind Farm | 204 MW | 14.4 km |
| Harvest Wind Project | 99 MW | 14.8 km |