Alice Falls Hydro Project
Clinton County, New York · EIA plant ID 54391 · Operator: Eagle Creek RE LLC
Nameplate2MWSummer 2 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor16%hydro units, summer MW
Heat rate—thermal plants only
First online1991
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 6.8 | 35.4% | — |
| 2002 | 8.1 | 42.2% | — |
| 2003 | 7.3 | 37.6% | — |
| 2004 | 7.5 | 38.7% | — |
| 2005 | 7.2 | 37.6% | — |
| 2006 | 8.7 | 45.1% | — |
| 2007 | 6.6 | 34.2% | — |
| 2008 | 5.2 | 26.9% | — |
| 2009 | 6.9 | 35.6% | — |
| 2010 | 5.5 | 28.5% | — |
| 2011 | 1.9 | 9.9% | — |
| 2012 | 0 | 0.0% | — |
| 2013 | 0 | 0.0% | — |
| 2014 | 0.1 | 0.5% | — |
| 2015 | 0 | 0.0% | — |
| 2016 | 0.1 | 0.6% | — |
| 2017 | 0.9 | 4.6% | — |
| 2018 | 2.6 | 13.7% | — |
| 2019 | 5.7 | 29.7% | — |
| 2020 | 3.1 | 16.0% | — |
| 2021 | 4.2 | 21.9% | — |
| 2022 | 6.4 | 33.1% | — |
| 2023 | 5 | 26.1% | — |
| 2024 | 6 | 30.9% | — |
| 2025 | 3 | 15.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 1.5 | 1.5 | Nov 1991 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 0.6 | 0.7 | Nov 1991 | Operating | — | coming soon |
Owner / operator
Operator: Eagle Creek RE LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Alice Falls Hydro, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Rainbow Falls Auscble | 3 MW | 0.6 km |
| Lower Saranac Hydroelectric Facility | 7 MW | 17 km |
| Burlington GT | 26 MW | 19.6 km |
| J C McNeil | 60 MW | 20.6 km |
| Saranac Facility | 286 MW | 21.6 km |
| Clinton LFGTE Facility | 6 MW | 21.8 km |