← Back to map

J C McNeil

Chittenden County, Vermont · EIA plant ID 589 · Operator: City of Burlington Electric - (VT)
OtherWood/Wood Waste BiomassISONEBA: ISNE
Nameplate60MWSummer 52 MW
Generators1in service
Net generation188GWh12 mo to Aug 2026
Capacity factor41%other units, summer MW
Heat rate14,999Btu/kWhfossil units, electric fuel, HHV
First online1984

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202541.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00012,00014,00016,0002005201020152020202514,999 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001192.238.9%11,857
2002180.338.8%11,586
2003230.349.0%15,122
200422047.1%15,748
2005236.451.4%12,853
2006264.557.7%16,548
2007283.561.8%13,988
2008252.254.6%14,270
2009222.747.9%14,449
2010272.258.9%14,753
2011227.449.2%15,187
2012225.448.8%15,099
201332069.6%14,627
2014287.262.5%14,793
2015290.463.4%14,611
2016305.966.8%14,109
201726958.9%14,154
2018245.553.7%15,393
2019227.249.7%16,264
2020229.750.1%16,044
2021273.459.9%14,874
202222950.1%14,657
2023184.840.5%14,867
202419743.0%15,402
2025209.345.9%15,706

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Wood/Wood Waste BiomassST59.552Jun 1984Operating—coming soon

Owner / operator

Operator: City of Burlington Electric - (VT). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Burlington Electric - (VT)50.0%30 MW
Green Mountain Power Corp31.0%18 MW
Vermont Public Power Supply Authority19.0%11 MW

Nearby plants

Within 80 km.
Chace Mill Winooski One8 MW1.6 km
Burlington GT26 MW1.7 km
Colchester 1618 MW3 km
Gorge 183 MW3.1 km
158th Fighter Wing Solar Farm1 MW4.6 km
Whitcomb Solar Farm2 MW5.7 km