Clinton LFGTE Facility
Clinton County, New York · EIA plant ID 56986 · Operator: casella waste systems
Nameplate6MWSummer 6 MW
Generators4in service
Net generation47GWh12 mo to Dec 2025
Capacity factor83%other units, summer MW
Heat rate—thermal plants only
First online2008
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2009 | 36.3 | 75.7% | — |
| 2010 | 40.2 | 71.6% | — |
| 2011 | 44.3 | 79.1% | — |
| 2012 | 44.4 | 79.0% | — |
| 2013 | 42.1 | 75.1% | — |
| 2014 | 39.6 | 70.6% | — |
| 2015 | 35.9 | 64.0% | — |
| 2016 | 33.9 | 60.3% | — |
| 2017 | 38.1 | 67.9% | — |
| 2018 | 28.9 | 51.5% | — |
| 2019 | 37.1 | 66.1% | — |
| 2020 | 35.5 | 63.2% | — |
| 2021 | 38.4 | 68.5% | — |
| 2022 | 43.1 | 77.0% | — |
| 2023 | 47.3 | 84.4% | — |
| 2024 | 47.8 | 85.1% | — |
| 2025 | 46.6 | 83.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 1.6 | 1.6 | Oct 2008 | Operating | — | coming soon |
| GEN2 | Landfill Gas | IC | 1.6 | 1.6 | Oct 2008 | Operating | — | coming soon |
| GEN3 | Landfill Gas | IC | 1.6 | 1.6 | Oct 2008 | Operating | — | coming soon |
| GEN4 | Landfill Gas | IC | 1.6 | 1.6 | Aug 2009 | Operating | — | coming soon |
Owner / operator
Operator: casella waste systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| casella waste systems | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| Mill C | 6 MW | 1.5 km |
| Kent Falls | 12 MW | 1.5 km |
| Cadyville | 6 MW | 2.2 km |
| Cavern | — | 4.7 km |
| Lower Saranac Hydroelectric Facility | 7 MW | 7.3 km |
| Route 22 Community Solar Farm CSG | 4 MW | 10.7 km |