← Back to map

Second Imperial Geothermal

Imperial County, California · EIA plant ID 54111 · Operator: ORCAL Geothermal, Inc
GeothermalGeothermalCAISOBA: IID

×48 MW geothermal retired since 2020 (latest Oct 2022)

Nameplate75MWSummer 52 MW
Generators4in service
Net generation275GWh12 mo to Dec 2025
Capacity factor60%geothermal units, summer MW
Heat rate—thermal plants only
First online2006

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202560.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001321.573.7%—
2002319.970.0%—
2003331.572.5%—
200429865.0%—
2005287.762.9%—
2006298.650.0%—
200731753.1%—
2008314.352.5%—
2009253.342.4%—
2010242.540.6%—
2011251.842.1%—
2012243.332.9%—
2013222.934.9%—
2014226.247.1%—
2015204.742.6%—
2016165.534.4%—
2017144.330.1%—
2018226.747.2%—
201921738.2%—
2020205.236.0%—
2021187.333.0%—
2022142.827.5%—
2023326.671.6%—
2024302.366.1%—
2025275.260.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GE13GeothermalBT1612Jan 2006Operating—coming soon
GEN14GeothermalBT1612Apr 2008Operating—coming soon
OEC1GeothermalBT26.517.5Nov 2022Operating—coming soon
OEC2GeothermalBT1610.6Nov 2022Operating—coming soon
GEN13GeothermalBT164planned Jan 2006not_current—coming soon
GE10GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon
GE11GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon
GE12GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon
GEN1GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN2GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN3GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN4GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN5GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN6GeothermalBT3.53Jun 1993Retired Oct 2022—coming soon
GEN7GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon
GEN8GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon
GEN9GeothermalBT4.53.8Jun 1993Retired Oct 2022—coming soon

Owner / operator

Operator: ORCAL Geothermal, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Second Imperial Geothermal Company57.0%43 MW
Ormat Nevada Inc43.0%32 MW

Nearby plants

Within 80 km.
Heber Solar11 MW0.5 km
Heber Geothermal92 MW1.6 km
Mount Signal Solar Farm V252 MW4.9 km
Imperial Valley Solar, LLC200 MW6.8 km
Wistaria Ranch Solar107 MW8.9 km
El Centro Hybrid388 MW9.8 km