El Centro Hybrid
Imperial County, California · EIA plant ID 389 · Operator: Imperial Irrigation District
113 MW planned (Natural Gas Internal Combustion Engine), first expected Sep 2029 · EIA-860M
Nameplate388MWSummer 323 MW
Generators7in service
Net generation870GWh12 mo to Aug 2026
Capacity factor34%gas/coal/oil units, summer MW
Heat rate8,721Btu/kWhfossil units, electric fuel, HHV
First online1952Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 492.2 | — | — |
| 2002 | 421.7 | — | — |
| 2003 | 489.4 | 24.7% | 10,340 |
| 2004 | 510.3 | 25.7% | 10,072 |
| 2005 | 552.8 | 27.9% | 9,871 |
| 2006 | 442.9 | 22.4% | 10,447 |
| 2007 | 431.4 | 21.8% | 10,478 |
| 2008 | 508.5 | 25.6% | 10,660 |
| 2009 | 523 | 26.4% | 10,612 |
| 2010 | 578.4 | 29.2% | 10,760 |
| 2011 | 771.1 | 47.9% | 9,861 |
| 2012 | 912.4 | 47.2% | 10,281 |
| 2013 | 1,186.1 | 41.6% | 8,637 |
| 2014 | 1,166 | 40.9% | 8,524 |
| 2015 | 999 | 36.3% | 8,847 |
| 2016 | 1,032.7 | 37.4% | 8,830 |
| 2017 | 1,044.6 | 38.1% | 8,310 |
| 2018 | 750.5 | 27.4% | 8,186 |
| 2019 | 638.3 | 23.3% | 8,207 |
| 2020 | 633.4 | 24.7% | 8,412 |
| 2021 | 952.7 | 37.2% | 8,736 |
| 2022 | 1,042.3 | 40.7% | 8,627 |
| 2023 | 1,086.9 | 42.4% | 8,685 |
| 2024 | 1,038.7 | 40.5% | 8,556 |
| 2025 | 1,089.7 | 42.6% | 8,505 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingYes
Net summer MW on gas71
Net summer MW on oil71
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 2 | Natural Gas Fired Combined Cycle | CA | 34.5 | 32.5 | Aug 1952 | Operating | — | coming soon |
| 2A | Natural Gas Fired Combined Cycle | CT | 89.9 | 73 | Jun 1993 | Operating | — | coming soon |
| 30 | Natural Gas Fired Combined Cycle | CA | 65.9 | 42 | Oct 2012 | Operating | — | coming soon |
| 31 | Natural Gas Fired Combined Cycle | CT | 43.2 | 39 | Oct 2012 | Operating | — | coming soon |
| 32 | Natural Gas Fired Combined Cycle | CT | 43.2 | 39 | Oct 2012 | Operating | — | coming soon |
| 4 | Natural Gas Steam Turbine | ST | 81.6 | 67.6 | Aug 1968 | Operating · retirement planned | Aug 2029 | coming soon |
| BESS | Batteries | BA | 30 | 30 | Oct 2016 | Operating | — | coming soon |
| RICE1 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| RICE2 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| RICE3 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| RICE4 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| RICE5 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| RICE6 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | planned Sep 2029 | Planned | — | coming soon |
| 3 | Natural Gas Steam Turbine | ST | 50 | 42 | Nov 1957 | Retired Sep 2010 | — | coming soon |
Owner / operator
Operator: Imperial Irrigation District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Imperial Irrigation District | 100.0% | 388 MW |
Nearby plants
Within 80 km.
| Sol Orchard El Centro PV | 20 MW | 0.6 km |
| IVC Solar | 3 MW | 4.5 km |
| Valencia 3 | 3 MW | 9.3 km |
| Second Imperial Geothermal | 75 MW | 9.8 km |
| Heber Geothermal | 92 MW | 10 km |
| Heber Solar | 11 MW | 10 km |