Guntersville

Marshall County, Alabama · EIA plant ID 48 · Operator: Tennessee Valley Authority
HydroConventional HydroelectricBA: TVA
Nameplate115MWSummer 123 MW
Generators4in service
Net generation509GWh12 mo to Dec 2025
Capacity factor47%hydro units, summer MW
Heat rate—thermal plants only
First online1939

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202547.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001558.253.1%—
2002595.359.8%—
2003821.982.2%—
2004655.460.1%—
2005682.665.9%—
2006612.758.0%—
2007414.139.2%—
2008505.146.9%—
2009771.871.8%—
2010645.360.0%—
201172267.2%—
2012666.561.8%—
2013839.978.1%—
2014713.466.4%—
2015740.968.9%—
2016506.347.0%—
2017724.567.4%—
2018733.768.3%—
2019667.562.1%—
202094187.3%—
2021599.355.8%—
2022560.752.2%—
2023453.442.2%—
2024454.842.2%—
2025509.147.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY28.831Aug 1939Operating—coming soon
2Conventional HydroelectricHY28.830.6Oct 1939Operating—coming soon
3Conventional HydroelectricHY28.829.8Dec 1939Operating—coming soon
4Conventional HydroelectricHY28.831.3Mar 1952Operating—coming soon

Owner / operator

Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tennessee Valley Authority100.0%115 MW

Nearby plants

Within 80 km.
Albertville4 MW16.9 km
Redstone Arsenal Hybrid11 MW29 km
Sand Valley Power Station5 MW49.2 km
TAI Huntsville Solar Hybrid32 MW50.3 km
Bellefonte14 MW53.4 km
Gadsdenretired59.8 km