Upper Beaver

Beaver County, Utah · EIA plant ID 3643 · Operator: Beaver City Corporation
HydroConventional HydroelectricBA: PACE
Nameplate3MWSummer 3 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%hydro units, summer MW
Heat rate—thermal plants only
First online1907

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202514.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20018.443.4%—
20026.332.5%—
20037.538.9%—
20045.930.5%—
20059.247.9%—
20069.951.1%—
200700.0%—
20087.840.6%—
200910.152.6%—
201010.949.9%—
201112.356.3%—
20128.940.4%—
201310.648.3%—
201410.146.1%—
201510.246.5%—
201611.250.8%—
201710.849.2%—
20187.433.7%—
201910.749.0%—
20209.342.3%—
202110.749.0%—
2022836.4%—
202310.246.4%—
202410.145.9%—
20253.314.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY1.31.3Aug 1907Operating—coming soon
2Conventional HydroelectricHY1.21.2Aug 1907Operating—coming soon

Owner / operator

Operator: Beaver City Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Beaver City Corporation100.0%3 MW

Nearby plants

Within 80 km.
Greenville Solar Plant2 MW22.3 km
Enel Cove Fort25 MW33.6 km
Buckhorn Solar Plant3 MW35 km
Blundell38 MW40.7 km
Fremont Solar—41.3 km
Milford Flat Solar Plant3 MW46.1 km