Fremont SolarUnder construction

Iron County, Utah · EIA plant ID 68153 · Operator: Fremont Solar, LLC
BatteryBA: PACE

297 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 297 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BA1BatteriesBA198198planned Dec 2027Under construction—coming soon
PV1Solar PhotovoltaicPV9999planned Dec 2027Under construction—coming soon

Owner / operator

Operator: Fremont Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Buckhorn Solar Plant3 MW6.3 km
Parowan Solar—15.1 km
Utah Red Hills Renewable Energy Park80 MW15.5 km
Greenville Solar Plant2 MW31 km
Cedar Valley Solar Plant3 MW33.5 km
Appaloosa Solar I200 MW35.1 km