← Back to map

Blundell

Beaver County, Utah · EIA plant ID 299 · Operator: PacifiCorp
GeothermalGeothermalBA: PACE
Nameplate38MWSummer 32 MW
Generators2in service
Net generation271GWh12 mo to Dec 2025
Capacity factor98%geothermal units, summer MW
Heat rate—thermal plants only
First online1984

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1001020GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), geothermal units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202597.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001152.775.8%—
2002184.491.5%—
2003198.598.5%—
2004194.996.5%—
2005184.891.7%—
2006190.694.6%—
2007163.978.5%—
2008254.385.1%—
2009279.193.7%—
2010274.492.1%—
2011278.193.4%—
2012268.589.9%—
2013250.784.2%—
201427592.3%—
2015259.787.2%—
2016256.986.0%—
201724983.6%—
2018223.174.9%—
2019115.241.5%—
2020175.663.0%—
2021211.276.1%—
2022262.194.4%—
2023248.289.4%—
2024272.597.9%—
2025271.297.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1GeothermalST26.123Jul 1984Operating—coming soon
2GeothermalST128.7Dec 2007Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%38 MW

Nearby plants

Within 80 km.
Cape Generating Station43 MW5.9 km
Milford Wind Corridor I LLC204 MW8.8 km
Escalante Solar III, LLC80 MW11.7 km
Milford Wind Corridor Stage II LLC102 MW12.7 km
Rodatherm Milford 1—14.4 km
Milford Solar 199 MW14.4 km